Do I need to tell my DNO about solar panels?
Yes. Your distribution network operator (DNO) must be told about any generator connected to the grid. Small systems under 16A per phase are notified under G98 after installation, while larger systems need a G99 application. Your installer normally handles this for you.
The detail
The DNO owns the local cables and substations. The rules come from two engineering recommendations:
- G98: Electricity North West says G98 applies to installations up to 16 amps per phase, which means single-phase systems up to 3.68 kW and three-phase systems up to 11.04 kW. National Grid says you must notify them within 28 days of commissioning.
- G99: anything larger falls into a G99 application, according to Electricity North West. Ask your installer to confirm the timing, because larger systems should be agreed with the DNO before they are connected.
Several points can catch people out:
- The limit is about inverter output, not panel size. A 4.5 kWp array on a 3.68 kW inverter can still fall under G98.
- A battery inverter adds to the total, so solar plus a battery can push a home into G99.
- In Northern Ireland, NIE Networks says the installer has 30 days from commissioning and will usually make the application for you.
Keep a copy of the G98 or G99 paperwork. Some export tariffs ask for proof of grid connection.